Analysis on the function of vibrating screen extension in asphalt mixing station

First of all, all operators should go through professional training and hold operating documents in order to work, in the whole process should strictly abide by the operating procedures to ensure safe production.
During the operation of asphalt mixing plant equipment, attention should be paid to observe the operating status of the equipment, not to leave the work at will, if abnormal conditions are found, should take timely measures to deal with.

In the production process of asphalt mixing plant, when it comes to consumption, we have to mention the cost of fuel used to occupy the key problem, which is the biggest consumption in the production process, so for the scientific and rational design of the whole equipment, it is necessary to improve the heat exchange efficiency as much as possible, so as to reduce the fuel consumption of the whole equipment.

For the work of the entire asphalt mixing station, we should understand that not only to ensure that the quality of reliable equipment, but also to have good operating technology, as well as first-class management level, only to achieve these, in order to ensure that the project on time quality and quantity to complete.

Safety is a big problem in the work of asphalt mixing stations, and it is also an issue that we need to maintain high priority at all times.
So, do you know how you can ensure that the work of the asphalt mixing station is done as safely as possible? Below we will analyze this issue with you, I hope to be able to help you.

Secondly, when starting a higher power motor, care should be taken to pay attention to its current changes at any time, preferably a one-start motor, to be fully started before going to start the next one.
Before starting the asphalt mixing station equipment, the surrounding staff should be alerted to the alarm, after obtaining the consent of the inspector, can start the equipment.

When it is found that the Asphalt Mixing Plants mixing plant equipment failure, need to carry out maintenance, should be carried out after the power outage, for example, for mixing cylinders, replacement liners, mixing arms, slurry leaves, vibration screening machine and other maintenance, should be carried out after the power outage, if necessary, should also arrange personnel guard.
In the maintenance of powder silo and dust collector and other equipment, because it belongs to aerial operations, should wear a good helmet to fasten the seat belt, in order to prevent the fall.
In the operation of belts, etc., it should be forbidden to have people close in case of danger.

From the current market point of view, it mainly includes three different categories, namely: single-axis vibrating screen, double-axis vibrating screen and resonant sieve and so on.
Among them, the first two in the asphalt mixing station work is widely used, the other although the production efficiency is high, but because the structure is too complex, maintenance is very troublesome, so it is now rarely used.
If it is classified according to the arrangement form of the vibrating mechanism, it can be divided into upper vibration type and lower vibration type.

By comparison, the latter is more traditional and very troublesome during installation and maintenance, so it is rarely used.
Nowadays, it is generally used on the structure of the upper vibration, which not only overcomes the shortcomings of the past, but also greatly simplifies its structural design.
However, in the work of asphalt mixing station, even if the performance of vibrating screen is intact, it will still be affected by some factors, so there will be some abnormal problems, affecting the normal screening work.

Therefore, in practical application, we need to arrange for personnel to clean the sieve regularly, in order to ensure the efficiency of screening, but also to improve the performance of the finished material indicators.
In addition, it is necessary to check the tightness of the transmission belt in time, and adjust or replace it in time to ensure the normal operation of the Sieve machine, to provide the basic conditions for the normal operation of the asphalt mixing station.

The next question, then, is how to minimize the cost of fuel in the production of asphalt mixing stations.
It is understood that the issue of fuel costs, and material storage and the reasonable design of the site is closely related.
Aggregate front end of the reasonable stacking, rain prevention measures, if the rain compensation is smooth, will reduce the water content of the aggregate, significantly reduce the amount of fuel.
This is because if the water content in the aggregate exceeds 5%, the moisture will cause the aggregate to consume more heat.
According to statistics, aggregate water content reduced by 1%, can reduce fuel consumption by 11%.

It is important to remind you that if you find that the screen needs to be replaced, then be sure to follow the requirements when replacing it.
First take down the dilapidated sieve, then install a new screen, and check the working status of the Sieve machine.
Only in this way can the normal work be guaranteed, in order to provide good conditions for the smooth production of asphalt mixing station.