Analysis of circulating heating process of asphalt mixing station equipment

.

5, with the pump pumping hot asphalt into and out of the oil tank, the staff should avoid, when the buoy indicator reaches the agreed maximum capacity, to timely stop writing to full load operation, in the event of bends, downhill to slow down early, to avoid emergency braking, oil tank loading dissatisfaction should always adhere to the speed of travel.

.

6, the heating furnace and equipment should be all viewed, a variety of instruments should be completely intact.
Pumps, valves, circulation systems and safety accessories should meet the skills request, overpressure, ultra-temperature alarm system should be reliable.

Therefore, if in the actual work, encountered this problem, then we must promptly find out the cause, and then take targeted measures, for example, for the above reasons, we can take appropriate measures to deal with.
If it is due to the low ambient temperature of the asphalt mixing station, then we need to take some insulation measures for the heat conduction oil pipeline.

When we examined the problem, we found that the heat conduction oil furnace was in a normal working state.
However, when looking at the asphalt circulatory system, it is found that because the temperature of the asphalt pipeline in the asphalt mixing station does not meet the requirements, the asphalt in the pipeline even has the problem of solidification.
In this case, we analyze that there may be four reasons for this to occur.
are: 1, the high oil tank height of the heat conduction oil is insufficient, 2, the inner layer tube eccentricity of the double-layer tube, 3, the heat conduction tubing road is too long, 4, the heat conduction oil pipeline lacks the insulation measure.

n

You need to understand the two types of asphalt equipment available on the market today, weigh the pros and cons of buying an asphalt device against your business needs, and make the appropriate decisions.

n

In the process of evaporation, because there will be a pressure difference in the asphalt mixing plant equipment, under the action of pressure difference, these steam will flow to the cold end of the heat pipe at a very high speed, and then by the which release of latent heat and condensation occurs.
We know that because of the effect of the suction core capillary suction, these condensate will return from the cold end to the hot end again.

First, the mechanism of Mobile Asphalt Plant damage avoidance in asphalt mixing station
1, asphalt operators should carry out a medical examination.
Those suffering from conjunctivitis, skin disease and allergic reactions to bitumen should not be engaged in asphalt work.

n

For this question, in fact, it is also very good understanding.
We need to start with the structure of the asphalt mixing station equipment.
Usually, it is composed of a sealed shell, a suction core close to the surface of the shell, and a working fluid encapsulated in the shell after the shell is vacuumed.
Therefore, when a heat source is used to heat one end of its heat pipe, the working fluid in it will boil due to heat and eventually evaporate.

First of all, let's introduce you to the effects of the production of asphalt mixing stations if the heating temperature does not meet the requirements.
Usually, when the temperature rises, the viscosity of the heavy oil will slowly drop, so that it is more convenient when conveying.
Therefore, in order to achieve such an effect, we will be in the process of transmission to take a heating way to achieve the goal.

.

8, seizures of asphalt hot, immediately soaked with cold water, drop the asphalt temperature, reduce the degree of skin ironing, conducive to the early healing of hot wounds, in the use of turpentine wipe, adhere to skin integrity, reduce the timing of infection, shorten the course of disease, reduce the suffering of patients.

I wonder if your friends have learned more about the work of the asphalt mixing plant.
If you have a certain understanding, then you should know that the asphalt mixing plant equipment has a more special function, this function is to be able to carry out circulating heating, so that the asphalt products to achieve the best state.
So how is this feature implemented? Next, let's take a look at the specific introduction.

n

From the above content can be seen, it is precisely because of the heating, heat from the hot end of the continuous transfer to the cold end, and which and then passed to the hot end, so that the continuous circulation, so as to meet the asphalt mixing station in the process of the relevant requirements, to achieve the requirements of cyclic heating.

.

7, it is necessary to often check the circulation system has no leakage, oscillation and noise, regular view of the expansion box of the liquid surface is not beyond the rules, automatic control system of the nature and reliability is not in line with the request, and should be regularly eliminated ash.

.

4, block asphalt transfer is usually appropriate in the night and the Sky Yin, in particular, should avoid the hot season, transfer timely selection of small mechanical loading and unloading, it is not appropriate to direct delivery by hand.